ANALYSIS OF DISPOSAL OF GOVERNMENT-OWNED CONSTRUCTION ASSETS THROUGH SALES MECHANISM IN ASSET MANAGEMENT OPTIMIZATION (A CASE STUDY AT THE SOUTH SULAWESI REGIONAL OFFICE OF THE NATIONAL ROAD IMPLEMENTING AGENCY)
ANALYSIS OF DISPOSAL OF GOVERNMENT-OWNED CONSTRUCTION ASSETS THROUGH SALES MECHANISM IN ASSET MANAGEMENT OPTIMIZATION (A CASE STUDY AT THE SOUTH SULAWESI REGIONAL OFFICE OF THE NATIONAL ROAD IMPLEMENTING AGENCY)
No Thumbnail Available
Date
2023
Authors
Yudhi Syarif Rachman
Syarifuddin
Amiruddin
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
Optimal disposal of government assets (BMN) is necessary to reduce the
burden on the state and improve efficiency. However, the disposal process
is often complicated and time-consuming. Delayed disposal leads to storage
issues and economic devaluation. This research aims to describe and
analyze the process of disposing of 35 heavy construction equipment
government assets through the auction mechanism at the South Sulawesi
Regional Office of the Ministry of Public Works and Housing (BBPJN
Sulawesi Selatan), identify internal and external factors that hinder the
process, and analyze the mitigation actions taken by BBPJN South Sulawesi
regarding these obstacles. The research method used is descriptive
qualitative case study at BBPJN South Sulawesi. The results show that the
disposal process of government assets through the auction mechanism at
BBPJN South Sulawesi consists of 11 stages in accordance with applicable
regulations and procedures. The obstacles faced include limited
knowledge, outdated data, weather conditions, the Covid-19 pandemic, and
the lengthy process of asset handover. BBPJN South Sulawesi has
implemented several mitigation measures, such as selecting competent
research teams and adjusting to the Covid-19 pandemic. Currently, the
process of disposing 35 heavy construction equipment takes approximately
10 months, but with resource optimization and strong commitment, it can
be completed in about 4 months